GroundUpCost

Sitework

Asphalt Driveway Cost Calculator β€” Florida

Paving quotes are quoted by the square foot, but the price per square foot falls as the driveway gets bigger β€” a crew and its machines cost the same for a day whether they lay 600 feet or 2,000. This works out both the tonnage you need and what the job should cost.

Figures on this page use Florida wage and material price data.

Florida runs a near year-round paving season, which is why quotes here are less seasonal than in the north. Jacksonville also bills stormwater in tiers by impervious area, so adding a large driveway can move a property up a tier on its monthly utility bill.

sq ft
$3,050 – $5,450
Typical: $3,900 Β· installed, materials and labor

What to order

Line itemLowHigh
Break out the old driveway Crew and machine time. Hauling it away is the next line. $395 $835
Haul away and dispose of the old asphalt Nothing at all where a contractor recycles it β€” plants buy clean millings back. $0 $300
Excavate and grade the subgrade $475 $715
Crushed stone base, 6 in Delivered. Picked up at the quarry it is cheaper; hauling roughly doubles it. $240 $585
Place and compact the base $235 $410
Hot-mix asphalt Delivered hot. Driveway loads are small, so they price above the per-ton rate a highway contract gets. $915 $1,500
Paving crew β€” paver, rakes and rollers A driveway is one visit for a small crew whatever its size, which is the minimum built in here. $685 $970
Driveway approach permit A right-of-way permit, not a building permit β€” driveways are exempt from that. $125 $125
Total $3,050 $5,450

Compare real quotes in Florida

This is a research estimate. Actual pricing depends on your site conditions, so get at least three quotes from licensed pros and ask each to itemize against the line items above β€” that is the fastest way to see why two bids differ.

What drives the price

A small driveway costs more per square foot, and that is not a markup

One Minnesota contractor publishes its own price table: removing and repaving 720 square feet costs $7.92 a square foot, 1,440 square feet costs $6.39, and 4,320 square feet costs $4.17. Nothing about the work changed β€” the paver, the rollers, the trucks and the crew cost the same for the day, and on a small job that day is divided by fewer square feet. Fitting a line through those three prices gives roughly $3,000 fixed plus $3.40 to $4.70 a square foot, which is why paving companies quote minimum charges of about $2,000 and why this calculator applies minimum crew hours instead of a flat rate per foot.

How the tonnage is worked out

Compacted hot-mix asphalt weighs 110 pounds per square yard for every inch of thickness β€” that is the Texas DOT specification, and Illinois DOT uses 112. So a square foot at 3 inches is 0.0183 tons, and one ton covers about 55 square feet at that thickness. Be careful with the coverage tables on the large cost-estimate sites: at least one of them says a ton covers 70 square feet at 3 inches, which is 27% short. Order to that number and the crew runs out of mix with the driveway half done.

Thickness and base do more for the life of a driveway than the asphalt does

The Asphalt Institute puts a residential driveway at about 3 inches of compacted asphalt over 4 inches of aggregate, with 4 to 8 inches of base depending on the soil. Going from 2 to 3 inches adds roughly a dollar to a dollar fifty a square foot and is worth it if trucks, trailers or an RV will sit on it. Asphalt laid thin over a failed base cracks in the same places within a few seasons, so a cheap quote that skips the base work is not the same job.

You probably do not need a building permit β€” but you may need a right-of-way permit

A driveway no more than 30 inches above grade is exempt from the building permit under the residential code, and Ohio writes that exemption into its own code. What a paving job usually needs instead is a right-of-way or driveway-approach permit for the part that meets the public street, which runs about $80 to $210 in the four cities researched here. A contractor who tells you a driveway needs a $400 building permit is quoting the wrong fee schedule.

Asphalt is cheaper than concrete up front and needs more attention afterwards

Every source compared here puts concrete at 1.4 to 2 times the price of asphalt for the same driveway, against a service life of 30 to 40 years versus 15 to 30. The gap is maintenance: sealcoating runs about $0.15 to $0.50 a square foot from contractors who publish a rate, with a minimum charge of $150 to $300 that makes a small driveway cost more per foot than that. Asphalt also flexes with freeze-thaw and shrugs off road salt, which is why it is the default surface in Michigan and Ohio, while concrete dominates in Texas and Florida where asphalt softens in summer heat.

Permits in Florida

Jacksonville charges $127.00 for a residential right-of-way permit, which covers the driveway connection. Replacing existing pavement skips the field review; new pavement gets one at the same fee. Work that never touches the right-of-way needs no permit at all β€” and starting before the permit issues doubles the fee.

Sources

Frequently asked questions

How many tons of asphalt does my driveway need?

Multiply the area in square yards by the thickness in inches, multiply by 110 pounds, and divide by 2,000. A 600 square foot driveway at 3 inches is 11 tons. The calculator above does this for you and shows the tonnage next to the price, because that is the number you hand to the plant.

What does an asphalt driveway cost per square foot?

Contractors who publish prices land between $3 and $8 a square foot installed, with resurfacing at the bottom and full tear-out with new base at the top. Treat any single per-square-foot figure with suspicion until you know the size it applies to β€” the same company charges nearly twice as much per foot on a small driveway as on a large one.

Can I resurface instead of replacing?

Only if the base is sound and the old surface is not badly broken up. An overlay is roughly half the cost because it skips demolition, disposal and base work, but laid over a failing base it will crack through in the same pattern within a few years. If the old driveway has potholes, alligator cracking or areas that move underfoot, the base is the problem.

How long does a driveway take, and when can I drive on it?

A typical residential driveway is one visit for a small crew. The surface is usually drivable within a day or two, but asphalt keeps curing for several months β€” keep it clear of sharp turns from parked wheels, jack stands and trailer jacks early on, and hold off sealcoating until it has cured, which most contractors put at six months to a year.

Does a new driveway change any of my bills?

It can. Several cities bill stormwater by how much hard surface a property has: Jacksonville charges single-family homes in tiers by impervious area, and Detroit bills $768.75 per impervious acre a month with a residential credit. A new 900 square foot driveway is enough to move a tier in some places. This is a monthly utility charge, not a permit fee, so it is not in the estimate above.

Is recycled asphalt worth considering?

Recycled asphalt pavement costs a fraction of virgin hot mix and is common for ranch roads and light-traffic drives. It does not bind as hard or look as uniform, and it is laid and compacted rather than hot-placed. For a driveway that has to look finished it is a compromise; for a long rural drive it is often the sensible choice.