Bathroom Remodel Cost Calculator — California

Two bathrooms of identical size can differ several times over in price. The split comes down to finish level and whether you move plumbing — everything else is comparatively minor.

Figures on this page use California wage and material price data.

Title 24 ventilation requirements and seismic strapping on water heaters add line items that most other states do not have, and CalGreen requires low-flow fixtures on any replacement.

sq ft
fixtures
$10,950 – $29,900
Typical: $18,450 · installed, materials and labor
Line itemLowHigh
Demolition to the studs Fixtures, tile, backer and drywall out of the wet area. $740 $2,400
Dumpster and debris disposal $370 $615
Plumber: set toilet, sink and faucet $365 $925
Toilet and faucet $340 $770
Vanity with top and sink $635 $1,050
Carpenter: vanity, mirror and accessories $200 $810
Mirror, accessories and paint $230 $425
Floor tile, thinset and grout Priced on the whole floor area, including waste. $140 $280
Tile setter: floor $295 $730
Wall tile, backer board and waterproofing Per sq ft of tiled wall — about 60 sq ft around a tub, 77 in a walk-in shower. $385 $665
Tile setter: walls, backer and waterproofing $810 $2,300
Plumber: shower valve and rough-in $280 $770
Shower valve and trim $150 $380
Bathtub Steel or acrylic, enameled composite, then cast iron. $370 $435
Plumber: set tub $270 $925
Semi-frameless glass door $475 $645
Glazier: door installation $135 $565
Electrician: GFCI circuit, exhaust fan and lighting $500 $2,000
Exhaust fan, lighting and wiring $410 $555
Drywall: hang and finish Moisture-resistant board outside the tiled area; taping takes several visits. $345 $1,050
Moisture-resistant drywall $55 $65
Painter $220 $900
Permits and inspections Building, plumbing, electrical and usually mechanical for the exhaust fan. $375 $685
General contractor overhead and profit Scheduling, supervision, insurance and profit on everything above. $2,850 $9,950
Total $10,950 $29,900

Compare real quotes in California

This is a research estimate. Actual pricing depends on your site conditions, so get at least three quotes from licensed pros and ask each to itemize against the line items above — that is the fastest way to see why two bids differ.

What drives the price

Moving plumbing is the decision that sets your budget

Keeping the toilet, vanity and shower drain where they are lets a crew work inside existing walls and floor penetrations. Relocating them means re-running drain and vent to code slope, and on a concrete slab, cutting and re-pouring the floor. Dallas remodelers publish $2,000 to $8,000 per fixture moved on a slab; on a framed floor it is usually a fraction of that.

Finish level changes every line differently

Finish is not one multiplier. Across Floor & Decor’s ranges, median floor tile runs from under a dollar a square foot for ceramic to about $8 for stone, and toilets run from about $100 to $1,000 — yet a cast-iron tub costs only about twice a steel one. Stone and large-format tile also take longer to set flat, so the high end adds labor as well as material.

Waterproofing is where cheap bids hide

A proper shower assembly, whether sheet membrane or liquid-applied over a sloped bed, costs real money and is invisible when finished. Bids that come in far under the others are frequently light here. Ask specifically which waterproofing system is quoted.

What a general contractor costs — and what managing it yourself saves

Remodelers keep about 30% of revenue after paying for labor, subcontractors and materials, according to the National Association of Home Builders — roughly a 43% markup on the work itself, covering scheduling, supervision, insurance and profit. Managing the trades yourself doesn’t save all of it: trades often charge individuals more, and scheduling, sequencing and no-shows become your problem. Owner-managers typically keep half to two-thirds of the contractor’s margin, which is what the self-managed option here assumes — roughly 15–20% below a contractor-run job.

Permits in California

Los Angeles issues one combined permit for home alterations, priced by job value with 26% added for each of plumbing and electrical and 13% for mechanical — about $380 to $680 for most full remodels. Only painting and papering are exempt; tile work is not.

Sources

Frequently asked questions

How long does a bathroom remodel take?

Columbus remodelers publish two to four weeks for a cosmetic refresh and five to eight weeks for a full bath on the same layout. Moving plumbing and waiting on permits and inspections add to that.

What should I budget beyond this estimate?

Set money aside for what opening the walls reveals — rot, old wiring, out-of-square framing. Bathrooms hide water damage better than any other room, and older houses hide more of it.

Does a bathroom remodel add resale value?

Mid-range bathroom remodels have historically recovered a meaningful share of their cost at resale, and high-end remodels recover proportionally less. Treat any recovery figure as market-specific rather than a rule.

Can I remodel a bathroom without a permit?

It depends on the city. Houston exempts painting, tiling, cabinets and countertops; Los Angeles exempts only painting and papering; Columbus requires a permit for any bath remodel. Moving plumbing or adding a circuit needs a permit almost everywhere, and unpermitted work can surface during a future sale.